Skip to main content

Breadcrumb

  1. Back to site
  2. Grid Code
  3. View Publication Categories

Grid Code

MPID 278 (Recommendation Papers issued)

  • Read more about MPID 278 (Recommendation Papers issued)

MPID 278 Revised – Correction of Reactive Power Capability
Requirements under CC.7.3.6.1

MPID278_Revised_GridCodeModifcationRecommendationForm.pdf
Modifications
Grid Code

MPID278 CRU Approval (17/12/2021)

  • Read more about MPID278 CRU Approval (17/12/2021)

Approval of the Grid Code Modification Recommendation MPID 278

MPID278_CRUApprovalLetter.pdf
Grid Code
Modifications

MPID 293 DSU Maximum Down Time

  • Read more about MPID 293 DSU Maximum Down Time

Grid Code Modification Proposal Form

MPID293_DRAI_DSU_Maximum_Down_Time.pdf
Grid Code
Modifications

IrelandGCRP_JGCRP_02Nov2021 (zip file)

  • Read more about IrelandGCRP_JGCRP_02Nov2021 (zip file)
IrelandGCRP_JGCRP_02Nov2021.zip
Modifications
Grid Code

Guidelines for Generators and Demand Side Units during System States

  • Read more about Guidelines for Generators and Demand Side Units during System States

Procedure which forms part of the EirGrid Group’s power system
emergency response planning

Guidelines-for-Generators-and-Demand-Side-Units-during-System-States-(Oct-2021).pdf
Grid Code
EirGrid Group
Generation
Operations

WFPS Approved Alternatives to Meteorological Mast

  • Read more about WFPS Approved Alternatives to Meteorological Mast

WFPS Approved Alternatives to Meteorological Mast

WFPS-Approved-Alternatives-to-Meteorological-Mast.pdf
Customer Information
Grid Code
Compliance & Testing
EirGrid

Ireland GCRP and JGCRP 20 July 2021

  • Read more about Ireland GCRP and JGCRP 20 July 2021

Agendas, Minutes and Presentations from the GCRP Meetings 20 July
2021

IrelandGCRP_and_JGCRP_20July2021.zip
Grid Code

MIPD 296 Correction of Wind Powered Controllable PPMs

  • Read more about MIPD 296 Correction of Wind Powered Controllable PPMs
MPID296_Correction_of_Wind_Powered_Controllable_PPMs.pdf
Modifications
Grid Code

MIPD 278 Correction Reactive Power Capability Requirements Revised

  • Read more about MIPD 278 Correction Reactive Power Capability Requirements Revised
MPID278_Correction_ReactivePowerCapability_Requirements_Revised.pdf
Modifications
Grid Code

ESPS Frequency Response Test Procedure Template

  • Read more about ESPS Frequency Response Test Procedure Template
ESPS-Frequency-Response-Test-Procedure-Template.docx
Grid Code
EirGrid

Pagination

  • Previous page
  • Current page 15
  • Next page
Subscribe to Grid Code