MPID 291 (CRU Approval 17/12/2021)
Approval of the Grid Code Modification Recommendation MPID 291
MPID291__CRUApprovalLetter.pdf
MPID 290 (CRU Approval 17/12/2021)
Approval of the Grid Code Modification Recommendation MPID
290
MPID290__CRUApprovalLetter.pdf
MPID 289 (CRU Approval 17/12/2021)
Approval of the Grid Code Modification Recommendation MPID
289.
MPID289__CRUApprovalLetter.pdf
MPID 278 (Recommendation Papers issued)
MPID 278 Revised – Correction of Reactive Power Capability
Requirements under CC.7.3.6.1
MPID278_Revised_GridCodeModifcationRecommendationForm.pdf
MPID278 CRU Approval (17/12/2021)
Approval of the Grid Code Modification Recommendation MPID 278
MPID278_CRUApprovalLetter.pdf
MPID 293 DSU Maximum Down Time
Grid Code Modification Proposal Form
MPID293_DRAI_DSU_Maximum_Down_Time.pdf
IrelandGCRP_JGCRP_02Nov2021 (zip file)
IrelandGCRP_JGCRP_02Nov2021.zip
Guidelines for Generators and Demand Side Units during System States
Procedure which forms part of the EirGrid Group’s power system
emergency response planning
Guidelines-for-Generators-and-Demand-Side-Units-during-System-States-(Oct-2021).pdf
Ireland GCRP and JGCRP 20 July 2021
Agendas, Minutes and Presentations from the GCRP Meetings 20 July
2021
IrelandGCRP_and_JGCRP_20July2021.zip
MIPD 296 Correction of Wind Powered Controllable PPMs
MPID296_Correction_of_Wind_Powered_Controllable_PPMs.pdf