EirGrid EMT model specification Solar PV PPM (July 2025)​

This document has been published by the TSO to provide clarity on the electromagnetic transient (EMT) modelling requirements for Solar PV Power Park Modules (PPM) in Ireland, as specified in Grid Code clause PC.A8 (Modelling Requirements for Users) [1.], in compliance with European legislation EU 2016/631 reflected in the Network Code for grid connection of generators (Requirements for Generators (RfG) [2.]).

EirGrid-EMT-model-specification-Solar-PV-PPM_v1.0.pdf

EirGrid EMT model specification BESS PPM (July 2025)​

This document has been published by the TSO to provide clarity on the electromagnetic transient (EMT) modelling requirements for Battery Energy Storage System (BESS) Power Park Modules (PPM) in Ireland, as specified in Grid Code clause PC.A8 (Modelling Requirements for Users) [1.], in compliance with European legislation EU 2016/631 reflected in the Network Code for grid connection of generators (Requirements for Generators (RfG) [2.]).

EirGrid-EMT-model-specification-BESS-PPM_v1.0.pdf