This report contains the list of ECP-2.5 / ECP-2.5.1 applicants processed under Category B and Category C as per the ECP-2 Decision Paper. The CRU has decided that for ECP-2, there should be a possible connection pathway for specific sub-categories of projects to be connected outside the framework of the batch process.