ECP-2.4 Constraints Analysis – Individual Area Results Webinar Slides 21 May 2025
ECP-2.4 Constraints Analysis – Individual Area Results Webinar Slides
ECP-2.4 IE Battery List
ECP-2.4 IE Battery List
Enduring Connection Policy - 2.5 (ECP-2.5 / ECP-2.5.1) 2024 Category A Final Batch May 2025
This report contains the list of applicants that will be processed under Category A as part of the 2024 ECP2.5 batch following payment of the balance of application fees to the relevant SO. As per the decision paper, the first 25 projectsin category A were selected on the basis of renewable output, with the projects having the largest volume of renewable GWhrs/yr generated being granted the highest priority. The subsequent 40 projects were selected in order of planning permission grant date. There is a cap of 10 storage and other system service technology projects in each ECP-2 batch.
Trip Report 2024/2025
Trip charges 2024-25
Ancillary Services & Other System Charges report for 2024/2025
AS payments and OSC charges 2024/2025
Voltage Fault Ride Through (Vfrt) Study Template and Assessment Guide (v3)
Voltage Fault Ride -Through (VFRT) is defined as the ability of a unit to stay connected to the electrical grid during and following a fault disturbance. With the increasing level of Inverter Based Resource (IBR) / Power Electronics (PE) generation, the power system dynamics are also changing due to the decreasing governor response and less synchronous inertia while creating a negative impact on frequency and voltage stability of the grid.