The purpose of this study was to asses the technical implications of installing a
110kV overhead line or cable between Ballyragget 110kV substation and Laois
400kV substation. In order to asses the feasibility of the overhead line/cable circuit,
power flow, short circuit, transient and harmonic studies were carried out.