The Industry Engagement Plan aims to provide clarity and timelines to potential Offshore Windfarm (OWF) Developers regarding EirGrid’s proposed engagement arrangements before, during, and after the ORESS Tonn Nua auction, as outlined in the CRU Decision Paper CRU20241243 (Grid Connection Pathway for Phase 2). This document is designed to facilitate collaborative efforts between OWF Developers and EirGrid in delivering the Project in Area A (Tonn Nua) of the SC-DMAP. It outlines a detailed Engagement Plan in Section 3, which includes proposed timelines for engagement activities, such as the Industry Workshop and the issuance of the Grid Connection Information (GCI) Pack, both before and after the ORESS Tonn Nua Auction.