Map showing route corridors (no title)
Map showing Route corridor A, 3B, preferreded route corridor for the Northern portion of the 400kV OHL, exisitng 220kV OHL and Indicative 400kV Line Route
Eirgrid�s Open Day in Athboy, planned for tomorrow Thursday, has been cancelled by the hotel
Add detailing the cancellation of an open day being held by EirGrid
EIRGRID ANNOUNCES EXTENSION OF PUBLIC INFORMATION AND CONSULTATION PROCESS
DOCUMENT GIVES DETAILS OF PUBLIC INFORMATION AND CONSULTATION PROCESS
EirGrid Position on NEPP ASKON Study Document Number: GDC-IR003-00
The purpose of this EirGrid document is to briefly review the Askon Study
and particularly to examine those understandings that may or may not
correlate with EirGrid�s and EirGrid�s consultants own understandings.
EirGrid Publishes Report on Underground Cables on Railway Lines 31st July
July 31 - EirGrid has published a report examining the viability of placing an underground
cable along disused railway lines, where present, running through Meath, Cavan , Monaghan
and on into Northern Ireland.
Cavan � Tyrone: Route Corridor A Map
Cavan � Tyrone: Route Corridor A Map
Tyrone-Cavan Interconnector Affected Cultural Heritage Sites In Wider Study Area Map (Sheets 1 and 2)
A3Tyrone-Cavan Interconnector Affected Cultural Heritage Sites In Wider Study Area Map (Sheets 1 and 2) AT SCALE 1:55,000
Tyrone-Cavan Interconnector Cultural Heritage Sites In Co. Monaghan Map (Sheet 1 of 1)
A3 Tyrone-Cavan Interconnector Cultural Heritage Sites In Co. Monaghan Map AT SCALE 1:55,000
Tyrone-Cavan Interconnector Known Cultural Heritage Maps (Sheets 1 ,2,3 and 4)
A3Tyrone-Cavan Interconnector Known Cultural Heritage Maps (Sheets 1 ,2,3 and 4) AT SCALE 1:25,000
Tyrone-Cavan Interconnector Zone Of Theoretical Visibility Map Sheet 1 OF 1
A3 Tyrone-Cavan Interconnector Zone Of Theoretical Visibility Map Sheet 1 OF 1 AT SCALE 1:100,000