MPID 278 (Recommendation Papers issued)
MPID 278 Revised – Correction of Reactive Power Capability
Requirements under CC.7.3.6.1
MPID278 CRU Approval (17/12/2021)
Approval of the Grid Code Modification Recommendation MPID 278
MPID 293 DSU Maximum Down Time
Grid Code Modification Proposal Form
EirGrid Grid Code Version 10 (Archive)
This is an archived version of the Grid Code. The Grid Code is a technical document that forms the rules around operating, maintaining and developing the transmission system. It also sets out the procedures for overseeing the actions of all transmission system users.
Guidelines for Generators and Demand Side Units during System States
Procedure which forms part of the EirGrid Group’s power system
emergency response planning
WFPS Approved Alternatives to Meteorological Mast
WFPS Approved Alternatives to Meteorological Mast
Ireland GCRP and JGCRP 20 July 2021
Agendas, Minutes and Presentations from the GCRP Meetings 20 July
2021