Laois - Kilkenny Reinforcement Project Environmental Reports Study Area Constraints Report - Hydrology and Hydrogeology October 2010
This report identifies the constraints associated with the Hydrology and Hydrogeology that exist in the study
area as defined for the proposed Laois-Kilkenny reinforcement project.
Laois - Kilkenny Reinforcement Project Environmental Reports Study Area Constraints Report - Solis and Geology
This report identifies the constraints associated with the soils and geology that exist in the study
area as defined for the proposed Laois-Kilkenny reinforcement project.
Laois - Kilkenny Reinforcement Project Environmental Reports Study Area Constraints Report - Flora And Fauna
This report identifies the constraints associated with the flora and fauna that exist in the study
area as defined for the proposed Laois-Kilkenny reinforcement project.
Laois - Kilkenny Reinforcement Project Environmental Reports Study Area Constraints Report - Landscape
This report identifies the constraints associated with the Landscape that exist in the study
area as defined for the proposed Laois-Kilkenny reinforcement project.
Laois - Kilkenny Reinforcement Project Environmental Reports Study Area Constraints Report - Cultural Heritage
This report identifies the constraints associated with the cultural Heritage that exist in the study
area as defined for the proposed Laois-Kilkenny reinforcement project.
Laois - Kilkenny Reinforcement Project Environmental Reports Study Area Constraints Report - Human Beings
This report identifies the constraints associated with human beings that exist in the study
area as defined for the proposed Laois-Kilkenny reinforcement project.
Laois - Kilkenny Reinforcement Project Description of Project Constraints
This report accompanies the Constraints Map PE687-D261-001-004-003, produced as part of the Laois-Kilkenny Reinforcement Project. This report gives a high level definition of each type of developmental or environmental constraint identified within the project study area and listed in the map legend or key.
Mullingar 110 kV Project Constraints and Route Corridor Report
This report was produced by Atkins for EirGrid for the specific purpose of Constraints and Route Corridor
Report Volume 1.
Mullingar 110 kV Project Constraints and Route Corridor Report - Executive Summary
This report was produced by Atkins for EirGrid for the specific purpose of Constraints and Route Corridor
Report Executive Summary.
East West Interconnector Letter To Residents
East West Interconnector Letter To Residents Of Rush By John Fitzgerald