Kildare-Meath Step 4B Report – Route Options and Evaluation Report
This Step 4B Report presents a description of the proposed
route.
Kildare-Meath Grid Upgrade Step 4 Engagement Report
This report provides a summary of engagement carried out in
the period that followed the public consultation for step 4 of
the Kildare-Meath Grid Upgrade project.
Kildare-Meath Step 4 Project Update Brochure
This document provides information about what this project is,
and an update on further assessments and developments that
have taken place since the announcement of the Emerging Best
Performing Option - Option A: The Red Option, in March 2022.
Uasghrádú Eangach na Mí ThoirBhaile Átha Cliath Thuaidh
Tionscadal Caipitil 1021
Céim 3 Bróisiúr um Nuashonrú
Earrach 2022
CP1021- Finglas 400 kV Connection Substation Feasibility Report
Substation Feasibility Assessment - Finglas 400 kV Connection.
CP1021 Environmental Constraints Report
This Environmental Constraints Report has been prepared to
identify the environmental constraints that should
be considered for the proposed project.
Capital Project 1021 - OHL Feasibility Report
This report only considers the technical feasibility of the
Overhead Line (OHL) options.
CP1021 Proposed Project Overview Report
Capital Project 1021 (CP1021) is a proposed project to
reinforce the electricity network between East Meath and
North Dublin.