CP1152 Arva protection Upgrade AAS Determination
The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.
CP1149 Newbridge Cushaling 110kV line Stations Bay Conductors and Lead in Conductor Uprate
The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.
CP1114 Drybridge and Platin AAS Determination
The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.
CP1032 Cashla 220kV Station Circuit Breaker Replacement AAS Determination
The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.
CP1031 Flagford 220kV Station Circuit Breaker Replacement AAS Determination
The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.
Transmission Development Plan 2020-2029 Consultation Report
The Consultation Report describes the TDP consultation
process. It also provides an overview of the submissions
received and our responses to the issues raised.
Transmission Development Plan 2020-2029 Environmental Appraisal Report
The EAR has been prepared to ensure that the TDP is in
accordance with the provisions of the adopted Grid
Implementation Plan 2017-2022 and associated Strategic
Environmental Assessment.
Transmission Development Plan 2020-2029
The Transmission Development Plan is a statuary document which
reports specific projects over the next ten years
CP0816 Proposed Site Investigation Works – Flagford-Tonroe 110 kV Line (County Roscommon)
The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.
CP1122 - 1125 AAS Determination Issue
The document sets out EirGrid’s Appropriate Assessment Screening
determination as to whether the project is likely to significantly
affect European sites designated by the EU Habitats Directive.