Grid Development

Uasghrádú Eangaí Chill Dara-na Mí - Céim 4 – Bróisiúr um Nuashonrú Tionscadail

  • Read more about Uasghrádú Eangaí Chill Dara-na Mí - Céim 4 – Bróisiúr um Nuashonrú Tionscadail

Tionscadal Caipitil 966
Céim 4 – Bróisiúr um Nuashonrú Tionscadail
Meitheamh 2022

210263-EirGrid-Kildare-Meath-Grid-Upgrade-IRISH.pdf
Grid Development

Kildare-Meath Step 4B Report – Route Options and Evaluation Report

  • Read more about Kildare-Meath Step 4B Report – Route Options and Evaluation Report

This Step 4B Report presents a description of the proposed
route.

KMGU-JAC-TN-0048-STEP-4B-Final.pdf
Grid Development

Kildare-Meath Grid Upgrade Step 4 Engagement Report

  • Read more about Kildare-Meath Grid Upgrade Step 4 Engagement Report

This report provides a summary of engagement carried out in
the period that followed the public consultation for step 4 of
the Kildare-Meath Grid Upgrade project.

Kildare-Meath-Step-4-Engagement-Report_FINAL-14-June-2022.pdf
Grid Development

Kildare-Meath Step 4 Project Update Brochure

  • Read more about Kildare-Meath Step 4 Project Update Brochure

This document provides information about what this project is,
and an update on further assessments and developments that
have taken place since the announcement of the Emerging Best
Performing Option - Option A: The Red Option, in March 2022.

210112-EirGrid-Kildare-Meath-Grid-Upgrade-JUN-22-_FINAL-140622.pdf
Grid Development

Uasghrádú Eangach na Mí ThoirBhaile Átha Cliath Thuaidh

  • Read more about Uasghrádú Eangach na Mí ThoirBhaile Átha Cliath Thuaidh

Tionscadal Caipitil 1021
Céim 3 Bróisiúr um Nuashonrú
Earrach 2022

209854-EirGrid-East-Meath-to-North-Dublin-STEP-3-Update-IRISH.pdf
Grid Development

CP 1021 -Belcamp 400 kV Connection

  • Read more about CP 1021 -Belcamp 400 kV Connection

Substation Feasibility Assessment.

321084AJ-REP-008-Belcamp-400-kV-Connection-Substation-Feasibility-Report-Final-April-2022.pdf
Grid Development

CP 1021 - Woodland 400 kV Connection

  • Read more about CP 1021 - Woodland 400 kV Connection

Substation Feasibility Assessment.

321084AJ-REP-007-Woodland-400-kV-Connection-Substation-Feasibility-Report-Final-April-2022.pdf
Grid Development

CP1021- Finglas 400 kV Connection Substation Feasibility Report

  • Read more about CP1021- Finglas 400 kV Connection Substation Feasibility Report

Substation Feasibility Assessment - Finglas 400 kV Connection.

321084AJ-REP-006-Finglas-400-kV-Connection-Substation-Feasibility-Report-Final-April-2022.pdf
Grid Development

CP1021 Environmental Constraints Report

  • Read more about CP1021 Environmental Constraints Report

This Environmental Constraints Report has been prepared to
identify the environmental constraints that should
be considered for the proposed project.

321084AJ-REP-004-Environmental-Constraints-Report-Final-May-2022.pdf
Grid Development

Capital Project 1021 - OHL Feasibility Report

  • Read more about Capital Project 1021 - OHL Feasibility Report

This report only considers the technical feasibility of the
Overhead Line (OHL) options.

321084AJ-REP-003-OHL-Feasibility-Report-Final-April-2022.pdf