Tyrone-Cavan Interconnector Individual Properties Assessment Detailed 500M Study Area Towers 50-56 (Map 10 of 20)
A3 Tyrone-Cavan Interconnector Individual Properties Assessment Detailed 500M Study Area Towers 50-56 (Map 10 of 20) AT SCALE 1:5000
Tyrone-Cavan Interconnector Individual Properties Assessment Detailed 500M Study Area Towers 1-8 (Map 1 of 20)
A3 Tyrone-Cavan Interconnector Individual Properties Assessment Detailed 500M Study Area Towers 1-8 (Map 1 of 20) AT SCALE 1:5000
Tyrone-Cavan Interconnector Water Enviroment Overview Map
A3 Tyrone-Cavan Interconnector Water Enviroment Overview Map AT SCALE 1:50,000
Tyrone-Cavan Interconnector Substation Site Alternatives
A3 Tyrone-Cavan Interconnector Substation Site Alternatives AT SCALE 1:75,000
Tyrone-Cavan Interconnector Exisiting NIE 110 & 275kV Infrastructure And Alternative Interconnector Options Map
A3 Tyrone-Cavan Interconnector Exisiting NIE 110 & 275kV Infrastructure And Alternative Interconnector Options Map Not To Scale
Tyrone-Cavan Interconnector Individual Properties Assessment Detailed 500M Study Area Towers 86-92 (Map 17 of 20)
A3 Tyrone-Cavan Interconnector Individual Properties Assessment Detailed 500M Study Area Towers 86-92 (Map 17 of 20) AT SCALE 1:5000
North-South Frequesntly Asked Questions - April 2013
North-South Frequently Asked Questions - April 2013
NSIC Reevaluation Community Brochure April 2013
NSIC Reevaluation Community Brochure April 2013
CAVAN-TYRONE & MEATH-CAVAN 400 KV TRANSMISSION CIRCUITS COMPARISON OF HIGH VOLTAGE TRANSMISSION OPTIONS: ALTERNATING CURRENT OVERHEAD & UNDERGROUND, & DIRECT CURRENT UNDERGROUND
This current document should thus be considered an addendum to the original 2009 Report, and should be read in conjunction with it to obtain a full understanding of the considerations upon which it is based.
North-South 400kV Interconnection Development Final Re-evaluation Report April 2013
EirGrid plc has undertaken a comprehensive re-evaluation of the North-South 400 kV Interconnection
Development Project. The re-evaluation process included a review of a previous application to An Bord
Plean�la for planning approval (of what was then referred to as the Meath-Tyrone 400 kV
Interconnection Development), in order to ascertain whether the scope, content, conclusions of, and
rationale for that previous application remain applicable for the purposes of informing and shaping a