CP1108 Proposed Dunstown Station Protection Upgrade
The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.
LC0102 Proposed Line Alteration to Facilitate Construction of N51 Dunmoe Phase 2 Road Project
The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.
CP1113 Proposed Corduff 220/110kV Station Works
The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.
CP1115 Proposed Drybridge and Connected Stations Projection Upgrades
The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.
Environmental Appraisal Report of the Transmission Development Plan 2018-2027
This Environmental Appraisal Report (EAR) has been prepared to ensure that the TDP 2018-2027 is in accordance with the provisions of the adopted Grid Implementation Plan 2017-2022 and associated Strategic Environmental Assessment (SEA).
EirGrid Evidence Based Environmental Studies List of Contributors
Evidence, Environmental Studies, List of Contributors
Grid25 Implementation Programme 2011-2016
This Grid25 Implementation Programme (IP) is a practical strategic overview of how the Irish electricity transmission grid is to be developed over the five years comprising 2011-2017.
SEA Statement of the Grid25 Implementation Programme 2011-2016 Strategic Environmental Assessment
Summary statement of the Strategic Environmental Assessment of the Grid 25 Implementaton Plan outlining environmental commtiments and mitigation for grid development 2011-2017
Non-Technical Summary Environmental Report for the Grid25 Implementation Programme 2011-2016 Strategic Environmental Assessment
Non technical summary of the findings of the Strategic Environmental Assessment of the Grid 25 Implementation plan 2011-2017
Environmental Report for the Grid25 Implementation Programme 2011-2016 Strategic Environmental Assessment
The purpose of this SEA Environmental Report –which should be read in conjunction with the Implementation Plan
– is to provide a clear understanding of the likelyenvironmental consequences of decisions arising from the Grid25 IP.