The Grid Link Project Electricity Transmission Scheme Linking Leinster & Munster AUTUMN 2012
The Grid Link Project Electricity Transmission Scheme Linking Leinster & Munster Autumn 2012 Public Information Brochure
The Grid Link Project Appendix G Landscape Figures
Appendix G Landscape Figures constraints maps
The Grid Link Project Appendix G Landscape Figures
Appendix G Landscape Figures constraints maps
MAJOR NEW ELECTRICITY POWER LINK FOR LEINSTER & MUNSTER TO ENSURE A SECURE AND RELIABLE ELECTRICITY SUPPLY, PROVIDE A PLATFORM FOR ECONOMIC GROWTH AND SUPPORT SUSTAINABLE & CLEAN ENERGY PUBLIC CONSULTATION OPENS TODAY
Cork, 12TH April 2012: Public consultation starts on the Grid Link Project, an estimated �500 million project planned by EirGrid to upgrade the electricity grid that will deliver a wide range of benefits to the national and regional economies. The development will involve the construction of a new power line linking Leinster and Munster.
The Grid Link Project Prepared for EirGrid by RPS Group Study Area Paper
This paper has been prepared by RPS Group on behalf of EirGrid. The intention of this paper is to
outline the proposed study area for the project and record the relevant considerations and
deliberations on the path to defining the study area. The proposed study area presented at the end of
this paper will form the basis of public consultation and the submissions received during this
consultation process together with the other considerations outlined in this paper will inform the final
project study area brought forward.