MPID 293 Recommendation Paper
MPID 293 DSU Maximum Down Time
MPID 294 Recommendation Paper
MPID 294 Align the Grid Code to the GCRP Constitution
MPID 297 Recommendation Paper
MPID 297 – Clarification of RfG and Non-RfG PPM Frequency
Periods
MPID 298 Recommendation Paper
MPID 298 GridCode v9 Housekeeping
MPID 299 Recommendation Paper
MPID 299 Reduction of Aggregator Limit to 1 MW
MPID 300 Solar PV Signal Requirements
Given the proposed increase in large-scale solar development
in Ireland it is necessary to include, in the Grid
Code, the required solar farm meteorological and availability
data signals.