MPID 300 Solar PV Signal Requirements
Given the proposed increase in large-scale solar development
in Ireland it is necessary to include, in the Grid
Code, the required solar farm meteorological and availability
data signals.
MPID 300 (Proposal Papers issued)
MPID 300 Solar PV Signal Requirements.
MPID 299 (Proposal Papers issued)
MPID 299 Reduction of Aggregator Limit to 1 MW
MPID 298 (Proposal Papers issued)
MPID 298 Grid Code v9 Housekeeping
MPID 297 (Proposal Papers issued)
MPID 297 – Correction of RfG and Non-RfG PPM Frequency Periods
MPID 294 (Proposal Papers issued)
MPID 294 Align the Grid Code to the GCRP Constitution
MPID 296 (Recommendation Papers issued)
MPID 296 – Correction of Wind Powered Controllable PPMs.
MPID 292 (CRU Approval 17/12/2021)
Approval of the Grid Code Modification Recommendation MPID 292
MPID 291 (CRU Approval 17/12/2021)
Approval of the Grid Code Modification Recommendation MPID 291
MPID 290 (CRU Approval 17/12/2021)
Approval of the Grid Code Modification Recommendation MPID
290