Enduring Connection Policy 2.2 Constraints Report for Area C Solar and Wind

It is a requirement of CRU’s ECP 2 decision, CRU/20/0603, that the Transmission System Operator (TSO) carry out system studies to inform applicants about possible generation constraint levels in Ireland. EirGrid will complete this requirement across twelve regional reports. The purpose of these reports is to provide generation developers with information on possible levels of generation output reduction for a range of scenarios.

Enduring Connection Policy 2.2 Constraints Report for Area B Solar and Wind

It is a requirement of CRU’s ECP 2 decision, CRU/20/0603, that the Transmission System Operator (TSO) carry out system studies to inform applicants about possible generation constraint levels in Ireland. EirGrid will complete this requirement across twelve regional reports. The purpose of these reports is to provide generation developers with information on possible levels of generation output reduction for a range of scenarios.

ECP 2.2 Solar and Wind Constraints Report Area A-v1.1

It is a requirement of CRU’s ECP 2 decision, CRU/20/0603, that the Transmission System Operator (TSO) carry out system studies to inform applicants about possible generation constraint levels in Ireland. EirGrid will complete this requirement across twelve regional reports. The purpose of these reports is to provide generation developers with information on possible levels of generation output reduction for a range of scenarios.