EU & UK TSO joint report on Multi Region Loose Volume Coupling (MRLVC)
Investigating any barriers to the delivery of joint and hybrid offshore projects that may result from existing trading arrangements or MRLVC, and any specific changes needed to existing trading arrangements or specific requirements of the design of MRLVC needed to deliver efficient electricity trading that supports the delivery of joint and hybrid offshore projects.
Quarterly Imperfections Cost Report Q4 July to September TY2024-25
Quarterly update of factors affecting Imperfection Costs.
Quarterly Imperfections Cost Report Q2 January to March TY2024-25
Quarterly update of factors affecting Imperfection Costs.
Load Frequency Control Block Operational Agreement (LFCBOA)
The Load Flow Control Block Operational Agreement document (hereafter referred to as “LFCBOA”) applies to the Block of Ireland (IE) and Northern Ireland (NI) and contains the Agreement required by Article 119 of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (hereafter referred to as “SOGL”). Article 3 of the LFCBOA, sets out the ramping restrictions for active power output in accordance with SOGL Article 137(3) and (4).
Quarterly Imperfections Cost Report Q1 October to December TY2024-25
Quarterly update of factors affecting Imperfections costs.
Controllability Status Update September 2024
This document outlines the list of all Controllable PPMs, 5MW or more on the EirGrid and SONI systems. Each unit is categorised as level (i), (ii) or (iii). The technology types are listed and identified as appropriate within the tables. This list will continue to be updated on a monthly basis.
Controllability Status Update August 2024
This document outlines the list of all Controllable PPMs, 5MW or more on the EirGrid and SONI systems. Each unit is categorised as level (i), (ii) or (iii). The technology types are listed and identified as appropriate within the tables. This list will continue to be updated on a monthly basis.
Controllability Status Update July 2024
This document outlines the list of all Controllable PPMs, 5MW or more on the EirGrid and SONI systems. Each unit is categorised as level (i), (ii) or (iii). The technology types are listed and identified as appropriate within the tables. This list will continue to be updated on a monthly basis.
Controllability Status Update June 2024
This document outlines the list of all Controllable PPMs, 5MW or more on the EirGrid and SONI systems. Each unit is categorised as level (i), (ii) or (iii). The technology types are listed and identified as appropriate within the tables. This list will continue to be updated on a monthly basis.
Controllability Status Update May 2024
This document outlines the list of all Controllable PPMs, 5MW or more on the EirGrid and SONI systems. Each unit is categorised as level (i), (ii) or (iii). The technology types are listed and identified as appropriate within the tables. This list will continue to be updated on a monthly basis.