Skip to main content

Breadcrumb

  1. Back to site
  2. EirGrid
  3. View Publication Categories

EirGrid

Customer Connections Substation Standards DRAFT v4

  • Read more about Customer Connections Substation Standards DRAFT v4

Customer Connections Substation Standards DRAFT v4

Customer-Connections-Substation-Standards-DRAFT-v4.docx
EirGrid

Customer Connections Substation Standards DRAFT v6

  • Read more about Customer Connections Substation Standards DRAFT v6

Customer Connections Substation Standards DRAFT v6

Customer-Connections-Substation-Standards-DRAFT-v6.docx
EirGrid

Customer Connections Substation Standards DRAFT v7

  • Read more about Customer Connections Substation Standards DRAFT v7

Customer Connections Substation Standards DRAFT v7

Customer-Connections-Substation-Standards-DRAFT-v7.docx
EirGrid

Policy Statement Busbar Configuration v3.0

  • Read more about Policy Statement Busbar Configuration v3.0

Policy Statement Busbar Configuration v3.0

4-Policy_Statement_Busbar_Configuration_v3.0.pdf
EirGrid

Policy Statement Earth Grid Fault - Level v1.1

  • Read more about Policy Statement Earth Grid Fault - Level v1.1

Policy Statement Earth Grid Fault

3-Policy_Statement_Earth_Grid_Fault_Level_v1.1.pdf
EirGrid

1-Policy_Statement_CT_VT_Cores_Protection_v1.0

  • Read more about 1-Policy_Statement_CT_VT_Cores_Protection_v1.0

The purpose of this document is to provide clarity in relation
to what access can be granted to transmission connected
Generators(IPPs)1 in relation to current and voltage
instrument transformers on the HV side of the Generator(IPP)’s
transformers.

1-Policy_Statement_CT_VT_Cores_Protection_v1.0.pdf
EirGrid

Data Centre Connection Offer Process and Policy paper

  • Read more about Data Centre Connection Offer Process and Policy paper

Data Centre Connection Offer Process and Policy paper

Data-Centre-Connection-Offer-Process-and-Policy-paper.pdf
EirGrid

Grid Code Review Panel Meeting – 19 November 2019

  • Read more about Grid Code Review Panel Meeting – 19 November 2019

Agendas, Approved Minutes and Presentations from the GCRP
Meetings 19 November 2019

GCRP_19Nov2019.zip
EirGrid

Renewable Electricity Support Scheme 1 Indicative Auction Timetable - 17 December 2019

  • Read more about Renewable Electricity Support Scheme 1 Indicative Auction Timetable - 17 December 2019

Renewable Electricity Support Scheme 1 Indicative Auction Timetable - 17 December 2019

RESS1-AT-RESS-1-Auction-Timetable-171219.pdf
EirGrid

Celtic Interconnector Step 4A - Consultant's Development Options Report

  • Read more about Celtic Interconnector Step 4A - Consultant's Development Options Report

Celtic Interconnector Step 4A - Consultant's Development Options Report

Celtic-Interconnector-Step-4A-Consultants-Development-Options-Report.pdf
EirGrid
Grid Development
Celtic Interconnector

Pagination

  • Previous page
  • Current page 50
  • Next page
Subscribe to EirGrid