Quarterly Imperfections Cost Report Jul 2022 - Sept 2022
Quarterly update of factors affecting Imperfections costs.
Scheduling and Dispatch 2022 and 2023 ToR and Consultation Report
This document describes the Terms of Reference (ToR) for the annual audit of the Scheduling and Dispatch process as to be implemented during the 2022 and 2023 audit periods. Its publication follows a public consultation on the proposed scope. Consultation responses are published above.
Outage Week 44(2022)-07(2023)
16 Week All-Island Generator Outage Plan
Guidelines for Power Park Modules during System States
Procedure which forms part of the EirGrid Group’s power system
emergency response planning
Outage Week 43(2022)-06(2023)
16 Week All-Island Generator Outage Plan
S2-LFC-Block-Operational-Agreement-for-Ireland-and-Northern-Ireland-29.09.2022-(post-Title-2-approval)
GL requires that TSOs of each synchronous area responsible for operating load frequency control and reserves, which for Ireland is EirGrid, and for Northern Ireland is SONI, should develop SAOA and LFCBOA.
S1-SAOA-for-the-Ireland-and-Northern-Ireland-Synchronous-area-29.09.2022 (post Title 2 approval)
GL requires that TSOs of each synchronous area responsible for operating load frequency control and reserves, which for Ireland is EirGrid, and for Northern Ireland is SONI, should develop SAOA and LFCBOA.
Outage Week 42(2022)-05(2023)
16 Week All-Island Generator Outage Plan
Outage Week 41(2022)-04(2023)
16 Week All-Island Generator Outage Plan
Outage Week 40(2022)-03(2023)
16 Week All-Island Generator Outage Plan