Ancillary Services & Other System Charges report for 2024/2025
AS payments and OSC charges 2024/2025
Trip Report 2024/2025
Trip charges 2024-25
Trip Report 2023/2024
Trip charges 2023-24
EirGrid Generic Flexible Demand Operating Protocol
This protocol sets out the operational arrangements in place between the System Operator and the Customer for implementation of Flexible Demand Arrangement at the Customer’s site(s).
Firm Access 2025 Review Report
List of Generators (Draft) for Firm Access Review 2025
Reduced Criteria for Generation Facilities Connection Application Form to the Transmission System (Word)
This application, (Reduced Criteria - Generation Application Form) outlines the reduced criteria EirGrid requires to progress an application for connection to the Transmission System.