Contracted TSO (Non-Wind) Generators as of 29 September 2021
Updated report, re connected projects
ECP-2.1 Update September 2021
Update on ECP-2.1 initial batch November 2020
Approved 2021/2022 Generator Transmission Use of System (GTUoS) Tariffs Accompanying Note
Approved 2021/2022 Generator Transmission Use of System
(GTUoS) Tariffs Accompanying Note
Approved 2021/2022 Generator Transmission Use of System (GTUoS) Tariffs
Approved 2021/2022 Generator Transmission Use of System
(GTUoS) Tariffs
Contracted TSO Wind Farms as of 23 August 2021
Updated report, re connected projects
110 kV AIS Substation Layout Drawings – Single bay non-extendable (XDN-LAY-ELV-STND-H-003-R04)
Design Standard drawings showing layout of 110 kV AIS single
bay non-extendable Substation
110 kV AIS C-Type Substation Single Line Diagram (XDN-SLD-STND-H-005-R03)
Design Standard drawings showing single line diagram of 110 kV
AIS C-Type Substation
Q2 2021 ATR Status Update - published 30-July-21
The document provides a quarterly update on ATR completion or
scheduled completion dates, so that generators can track the
status of the ATRs associated with their generation
project(s).