Contracted TSO (Non Wind) Generators as of 29 May 2020
Updated report, re connected projects
TSO_NonWind_Contracted_29.05.2020.pdf
RfG_Operation at High and Low Frequency Test Procedure Template
RfG_Operation at High and Low Frequency Test Procedure Template
RfG_Operation-at-High-and-Low-Frequency-Test-Procedure-Template.docx
RfG_Governor Response and Operating Reserves Test Procedure Template
RfG_Governor Response and Operating Reserves Test Procedure
Template
RfG_Governor-Response-and-Operating-Reserves-Test-Procedure-Template.docx
RfG_Governor Deadband Test Procedure Template
RfG_Governor Deadband Test Procedure Template
RfG_Governor-Deadband-Insensitivity-Test-Procedure-Template.docx
Reliability Run Test Procedure Template
Reliability Run Test Procedure Template
Reliability-Run-Test-Procedure-Template.docx
Registered Characteristics Test Procedure Template
Registered Characteristics Test Procedure Template
Registered-Characteristics-Test-Procedure-Template.docx
Registered Capacity Test Procedure Template
Registered Capacity Test Procedure Template
Registered-Capacity-Test-Procedure-Template.docx
Ramp Rates Test Procedure Template
Ramp Rates Test Procedure Template
Ramp-Rates-Test-Procedure-Template.docx
Operation on Primary Secondary Mix Fuel Test Procedure Template
Operation on Primary Secondary Mix Fuel Test Procedure Template
Operation-on-Primary_Secondary_Mix-Fuel-Test-Procedure-Template.docx
Operation at High and Low Generator Voltage Test Procedure Template
Operation at High and Low Generator Voltage Test Procedure Template
Operation-at-High-and-Low-Generator-Voltages-Test-Procedure-Template.docx