ECP-2.4 - Solar and Wind Constraints Report - Results for Area K v1.1
ECP-2.4-Solar-and-Wind-Constraints-Report-Results-for-Area-K-v1.1.pdf
ECP-2.4 - Solar and Wind Constraints Report - Results for Area H2 v1.1
ECP-2.4-Solar-and-Wind-Constraints-Report-Results-for-Area-H2-v1.1.pdf
ECP-2.4 - Solar and Wind Constraints Report - Assumptions and Methodology v1.1
ECP-2.4-Solar-and-Wind-Constraints-Report-Assumptions-and-Methodology-v1.1.pdf
Proposed 2025/26 Generator Use of System Tariffs (GTUoS)
This document outlines the proposed Generator Transmission Use of System (GTUoS) charges for both Ireland and Northern Ireland as calculated by the Transmission System Operators (TSOs) for the 2025/2026 tariff year.
2526-Proposed-GTUoS-Tariffs-IE.pdf
ECP 2.4 - Frequently Asked Questions
After the ECP 2.4 constraint forecast publications and webinars, several queries were received from the industry. The purpose of this paper is to capture and respond to queries received from industry through different engagements to benefit the wider industry. The productive engagements with different stakeholders have led to changes, updates, additional information published for ECP 2.4 constraint forecast, and improvements for consideration in ECP -2.5 constraint forecast.
ECP-2.4-Frequently-Asked-Questions.pdf
ECP-2.4 Constraints Analysis Interconnector Flows
ECP-2.4-Constraints-Analysis-Interconnector-Flows.xlsx
Outage Week 27(2025) - 42(2025)
Outage-Week-27(2025)-42(2025).xlsx
ECP-GSS-1 Pre-application Notification Form (Word)
ECP-GSS-Pre-Application-Notification-Form.docx
ECP-GSS-1 Pre-application Notification Form (PDF)
ECP-GSS-Pre-Application-Notification-Form.pdf
Outage Week 25(2025) 40(2025)
Outage-Week-25(2025)-40(2025).xlsx