Enduring Connection Policy - 2.5 (ECP-2.5) 2024 Category A Initial Batch January 2025
This report contains the initial list of applicants that will be processed under Category A as part of the 2024 ECP-2.5 batch following payment of the balance of application fees to the relevant SO. As per the decision paper, the first 25 projects in category A were selected on the basis of renewable output, with the projects having the largest volume of renewable GWhrs/yr generated being granted the highest priority. The subsequent 41 projects were selected in order of planning permission grant date.
2025 Standard Transmission Charges
In May 2009 the CER (Commission for Energy Regulation) published a decision paper on Standard Transmission Charges and Timelines (CER/09/077). CER/09/077 document sets out the standard transmission charges and timelines for some transmission assets to be used by EirGrid plc (EirGrid) when issuing offers for connection to the transmission system. These charges are updated annually to reflect the change in Harmonised Index of Consumer Prices (HICP) as published by the Central Bank of Ireland.
Trip Report 2023/2024
Trip charges 2023-24
EirGrid Generic Flexible Demand Operating Protocol
This protocol sets out the operational arrangements in place between the System Operator and the Customer for implementation of Flexible Demand Arrangement at the Customer’s site(s).
Firm Access 2025 Review Report
List of Generators (Draft) for Firm Access Review 2025