Day Ahead Fallback Procedures - IU TSOs proposal
A proposal for robust and timely fallback procedures to ensure efficientbcapacity allocation in the event that the single day-ahead coupling process is unable to produce results.
Q2 2017 SCR Status Update – 31 July 17
Quarterly update on the status of short circuit reinforcements associated with generation projects from a short circuit driven deep perspective (known as SCRs).
Q2 2017 ATR Status Update - 31 July 2017
Quarterly update on the status of transmission reinforcements associated with generation projects from a load flow deep perspective (known as ATRs).
EirGrid Tomorrow's Energy Scenarios Summary Booklet 2017
EirGrid Tomorrow's Energy Scenarios Summary Booklet 2017
EirGrid Tomorrow's Energy Scenarios Report 2017
EirGrid Tomorrow's Energy Scenarios Report 2017
Proposed 2017/2018 Generator Transmission Use of System (GTUoS) Tariffs
Proposed 2017/2018 Generator Transmission Use of System (GTUoS) Tariffs
GLDPM-v1
Common Grid Model Methodology (CGMM) - as required under Article 9(6) of CACM.
CGMM-v1-plus
Generation and Load Data Provision Methodology (GLDPM) – as required under Article 16 of CACM.
RfG Banding Thresholds Consultation Minded-To Position Ireland
RfG Banding Thresholds Consultation Minded-To Position Ireland
Transmission Outage Summary 2017 (Week 27-28)
Transmission Outage Summary 2017 (Week 27-28)