Customer Information

Day Ahead Fallback Procedures - IU TSOs proposal

  • Read more about Day Ahead Fallback Procedures - IU TSOs proposal

A proposal for robust and timely fallback procedures to ensure efficientbcapacity allocation in the event that the single day-ahead coupling process is unable to produce results.

Day-ahead-Fallback-Procedures-IU-TSOs-proposal.pdf
EirGrid
Customer Information

Q2 2017 SCR Status Update – 31 July 17

  • Read more about Q2 2017 SCR Status Update – 31 July 17

Quarterly update on the status of short circuit reinforcements associated with generation projects from a short circuit driven deep perspective (known as SCRs).

2017-Q2-SCR-Status-Update.pdf
EirGrid
Customer Information

Q2 2017 ATR Status Update - 31 July 2017

  • Read more about Q2 2017 ATR Status Update - 31 July 2017

Quarterly update on the status of transmission reinforcements associated with generation projects from a load flow deep perspective (known as ATRs).

2017-Q2-ATR-Status-Update-31-July-2017.pdf
EirGrid
Customer Information

EirGrid Tomorrow's Energy Scenarios Summary Booklet 2017

  • Read more about EirGrid Tomorrow's Energy Scenarios Summary Booklet 2017

EirGrid Tomorrow's Energy Scenarios Summary Booklet 2017

EirGrid-Tomorrows-Energy-Scenarios-Summary-2017.pdf
EirGrid
Customer Information

EirGrid Tomorrow's Energy Scenarios Report 2017

  • Read more about EirGrid Tomorrow's Energy Scenarios Report 2017

EirGrid Tomorrow's Energy Scenarios Report 2017

EirGrid-Tomorrows-Energy-Scenarios-Report-2017.pdf
Customer Information
EirGrid

Proposed 2017/2018 Generator Transmission Use of System (GTUoS) Tariffs

  • Read more about Proposed 2017/2018 Generator Transmission Use of System (GTUoS) Tariffs

Proposed 2017/2018 Generator Transmission Use of System (GTUoS) Tariffs

Proposed-1718-Generator-Transmission-Use-of-System-(GTUoS)-Tariffs.pdf
Customer Information
Information Note
EirGrid

GLDPM-v1

  • Read more about GLDPM-v1

Common Grid Model Methodology (CGMM) - as required under Article 9(6) of CACM.

GLDPM-2016-05-16-1800h.pdf
EirGrid
Customer Information

CGMM-v1-plus

  • Read more about CGMM-v1-plus

Generation and Load Data Provision Methodology (GLDPM) – as required under Article 16 of CACM.

CGMM-v1-plus.pdf
Customer Information
EirGrid

RfG Banding Thresholds Consultation Minded-To Position Ireland

  • Read more about RfG Banding Thresholds Consultation Minded-To Position Ireland

RfG Banding Thresholds Consultation Minded-To Position Ireland

RfG-Banding-Thresholds-Consultation_Minded-To-Position_Ireland.pdf
Customer Information
EirGrid

Transmission Outage Summary 2017 (Week 27-28)

  • Read more about Transmission Outage Summary 2017 (Week 27-28)

Transmission Outage Summary 2017 (Week 27-28)

Transmission-Outage-Summary-Weeks-27-28.pdf