Contracted TSO Wind Farms as of 03 November 2021
Updated report, re connected projects
TSO-Wind-Contracted-03.11.2021.pdf
Contracted TSO Wind Farms as of 29 September 2021
Updated report, re connected projects
TSO-Wind-Contracted-29.09.2021.pdf
Contracted TSO (Non-Wind) Generators as of 29 September 2021
Updated report, re connected projects
TSO-Non-Wind-Contracted-29.09.2021.pdf
ECP-2.1 Update September 2021
Update on ECP-2.1 initial batch November 2020
2020-Batch-(ECP-2.1)-Results-Joint-SO-Publication_September-2021.pdf
Approved 2021/2022 Generator Transmission Use of System (GTUoS) Tariffs Accompanying Note
Approved 2021/2022 Generator Transmission Use of System
(GTUoS) Tariffs Accompanying Note
2122-Approved-GTUoS-Tariffs-Accompanying-Note-v1.0.pdf
Approved 2021/2022 Generator Transmission Use of System (GTUoS) Tariffs
Approved 2021/2022 Generator Transmission Use of System
(GTUoS) Tariffs
2122-Approved-GTUoS-Tariffs-v1.pdf
Contracted TSO Wind Farms as of 23 August 2021
Updated report, re connected projects
Revised-TSO-Wind-Contracted-23.08.2021.pdf
Contracted TSO (Non Wind) Generators as of 23 August 2021
Updated report, re connected projects
Revised-TSO-Non-Wind-Contracted-23.08.2021.pdf
Contracted TSO (Non Wind) Generators as of 9 July 2021
Updated report, re connected projects
Contracted-TSO-(Non-Wind)-Generators-as-of-9-July-2021.pdf
Contracted TSO Wind Farms as of 9 July 2021
Updated report, re connected projects
Contracted-TSO-Wind-Farms-as-of-9-July-2021.pdf