Fault Ride Through Study Template v2.0
This document is a major update to the template for the
submission of Fault Ride-Through Studies.
WECC Model Submission Spreadsheet v1.0
This spreadsheet is for the 2nd generation WECC generic model
parameter submissions.
Firm Access Review
This document summaries the research and development phase,
the core concepts of firm access allocation, the details of
the new methodology and the next steps.
Contracted TSO (Non-Wind) Generators as of 03 December 2021
Updated report, re connected projects
Contracted TSO Wind Farms as of 03 December 2021
Updated report, re connected projects
Contracted TSO (Non-Wind) Generators as of 04 November 2021
Updated report, re connected projects
Contracted TSO Wind Farms as of 03 November 2021
Updated report, re connected projects
Contracted TSO Wind Farms as of 29 September 2021
Updated report, re connected projects