Procurement category figures over €20,000 – July to September 2019
A list of purchase orders over €20,000 from July to September 2019
Outage Week 48(2019)-11(2020)
16 Week All-Island Generator Outage Plan
Outage Week 47(2019)-10(2020)
16 Week All-Island Generator Outage Plan
AS OSC Report September 2019
This report contains a monthly breakdown of the Ancillary Services & Other System Charges for the 2018/2019 tariff year.
Other System Charges (OSC) Trip Report 2018-19
This report contains a monthly breakdown of the All-island Trip Charges for the 2018/2019 tariff year.
Celtic Interconnector Project Map - Kilquane - Converter station option and cable route
Celtic Interconnector Project Map - Kilquane - Converter station option and cable route
All-Island Ten Year Transmission Forecast Statement 2018 - Study Files
These are the Study Files to accompany All-Island Ten Year
Transmission Forecast Statement (TYTFS) 2018. The TYTFS
describes and presents technical network data such as the
network configuration, network parameters, generation
connections and power flows, and fault levels for future
network conditions. This enables the reader to carry out
their own network analysis if they wish. In addition, the
TYTFS outlines opportunities for demand and generation
connections in Ireland and Northern Ireland.
Outage Week 46(2019)-09(2020)
16 Week All-Island Generator Outage Plan
Wind Forecasting Accuracy Report – October 2019
Wind forecasting accuracy report
Outage Week 45(2019)-08(2020)
16 Week All-Island Generator Outage Plan