GRID25 NEWSLETTER Issue No.10 DECEMBER 2012
This Newsletter covers GRID25 PROGRAMME MILESTONES ACHIEVED to date December 2012
EWIC Wales Route Map
EWIC Wales Route Map
GRID25 NEWSLETTER Issue No. 9 October / November 2012
This Newsletter covers GRID25 PROGRAMME MILESTONES ACHIEVED to date October/November 2012
West Galway Substation Stage 2 - Lead Consultant?s Report Evaluation of Options
This Stage 2 Report gives consideration to feedback arising from Stage 1. The report identifies a preferred substation site and substation technology. It also presents a number of alternative options in relation to the loop-in connection of the substation, in terms of both technology and location.
The Grid Link Project User�s Guide to the Constraints Report
This document provides a description of the Constraints Report and a guide to accessing the
constraints maps.
North-South 400kV Interconnection Development Indicative Line Route
A3 North-South 400kV Interconnection Development Indicative Line Route map at scale 1:10,000
The Grid Link Project User�s Guide to the Constraints Report
This document provides a description of the Constraints Report and a guide to accessing the
constraints maps.
THE GRID LINK PROJECT Floodplains (Map 1 of 4)
A3 THE GRID LINK PROJECT Floodplains (Map 1 of 4) AT SCALE 1:300,000
THE GRID LINK PROJECT High Pressure Sites map
A3 THE GRID LINK PROJECT High Pressure Sites map AT SCALE 1:610,000
THE GRID LINK PROJECT High Status Sites map
A3 THE GRID LINK PROJECT High Status Sites map AT SCALE 1:610,000