Dublin North Fringe 220kV Reinforcement Project Stage 1 Lead Consultant�s Report

This report has been prepared by ESBI Engineering Solutions for the purpose of
identifying suitable sites for the construction of a new 220kV indoor station within
the Dublin City Council North Fringe area of Dublin on behalf of EirGrid plc, the
transmission system operator.

Clashavoon - Dunmanway Electrical Reinforcement Scheme Public Information

The document covers following the completion of the Phase 2 consultation and engagement period, the Phase 2 Lead Consultants Report, identifying the preferred route corridor and the indicative overheard line routewhich was published The preferred route corridor, indicative overheard line route and copies of the Phase 2 Lead Consultants Report will be
available to the public to view between the 29th July and 26th of August 2011 at the locations below.

16010859-ETD/POL 11-1387A Study for the EirGrid East-West Interconnector high voltage DC 200 kV land cables An independent assessment Arnhem

This report will give the results and conclusions reached after KEMA�s assessment of the five
safety topics agreed upon. The report is organised in sections, each focusing on a certain safety
aspect, and is ended with a concise set of conclusions.