Dublin North Fringe 220kV Reinforcement Project Stage 1 Lead Consultant�s Report
This report has been prepared by ESBI Engineering Solutions for the purpose of
identifying suitable sites for the construction of a new 220kV indoor station within
the Dublin City Council North Fringe area of Dublin on behalf of EirGrid plc, the
transmission system operator.
Dublin North Fringe 220 kV Reinforcement Map 2
Dublin North Fringe 220 kV Reinforcement Study Area Map
North South 400 kV Interconnection Development Non-statutory Consultation on the Preliminary Re-evaluation Report
EirGrid?s Response to Feedback Received at the Meeting of Monaghan County Council on 20 June 2011
Clashavoon - Dunmanway Electrical Reinforcement Scheme Public Information
The document covers following the completion of the Phase 2 consultation and engagement period, the Phase 2 Lead Consultants Report, identifying the preferred route corridor and the indicative overheard line routewhich was published The preferred route corridor, indicative overheard line route and copies of the Phase 2 Lead Consultants Report will be
available to the public to view between the 29th July and 26th of August 2011 at the locations below.
CLASHAVOON-DUNMANWAY Project Phase 2 Lead Consultants Report Route Corridor Evaluation and Indicative Line Route Selection Report
This Phase 2 Lead Consultants Report prepared by ESB International, should be read in conjunction with
the previously published Phase 1 Lead Consultants Corridor Identification Report available on the EirGrid projects webpage
16010859-ETD/POL 11-1387A Study for the EirGrid East-West Interconnector high voltage DC 200 kV land cables An independent assessment Arnhem
This report will give the results and conclusions reached after KEMA�s assessment of the five
safety topics agreed upon. The report is organised in sections, each focusing on a certain safety
aspect, and is ended with a concise set of conclusions.
17 June 2011 - Press Release - Consultation Extension
17 June 2011 - Press Release - Consultation Extension
GRID25 NEWSLETTER Issue No 4. June/July 2011
This Newsletter covers GRID25 PROGRAMME MILESTONES ACHIEVED to date June/July 2011
Appendix 1 STAGE 1 RECORD OF CONSULTATION
This is a list of those that received a Stage 1 update cover letter, brochure and Stage 1 report on May
20th 2011.
North Kerry Project Constraints Map With Emerging Preferred Project Solution
A1 North Kerry Project Constraints Map With Emerging Preferred Project Solution AT SCALE 1:32000