MPID 236 CER Approval Letter
MPID 236 CER Approval Letter
MPID236AssessmentOfCapacityAdequacyCERApproval.pdf
MPID 230 - CER Approval Letter
MPID 230 - CER Approval Letter
MPID227_228_230_CER_Aprroval_26Feb2013.pdf
MPID 230 - Fault Ride Through
MPID 230 - Fault Ride Through
MPID230FaultRideThrough.pdf
Overall Site Safety Proposal
Overall Site Safety Proposal
MPID-225-OC11.5.4-Site-Safety.pdf
Ramp Rate WFPS Proposal
Ramp Rate WFPS Proposal
MPID227FrequencyResponseAndRampRates.pdf
Reactive Power WFPS Proposal
Reactive Power WFPS Proposal
MPID228WindfarmReactiveCapability.pdf
SEA Statement of the Grid25 Implementation Programme 2011-2016
Read EirGrid's Srategic Environmental Assessment of the Grid25 Implementation Programme 2011-2016
2741 EirGrid SEA Statement Report - 19th Feb 2013 (single pages).pdf
ACER Regulatory Update 17.01.2013
ACER is responsible for delivering the Internal Market.
ACER Stakeholder Forum Slides 17 01 13 (2).pdf
TSO Contracted Wind
TSO Contracted Wind
ContractedTSOWindFarms19thDecember2013.pdf
TSO Contracted Wind
TSO Contracted Wind
ContractedTSOWindFarms18July2013.pdf