Skip to main content

Breadcrumb

  1. Back to site
  2. EirGrid
  3. View Publication Categories

EirGrid

Interconnector Reserve test report template

  • Read more about Interconnector Reserve test report template

Interconnector Reserve test report template

Interconnector-Reserve-test-report-template.docx
Grid Code
DS3 Programme
EirGrid

Interconnector Reserve Test Procedure Template

  • Read more about Interconnector Reserve Test Procedure Template

Interconnector Reserve test procedure template

Interconnector-Reserve-test-procedure-template.docx
Grid Code
DS3 Programme
EirGrid

Signal List for WFPS (Northern Ireland)

  • Read more about Signal List for WFPS (Northern Ireland)

The WFPS Signal List which includes the signals required for the provision of System Services

NI-WFPS-Signal-List-System-Services-Emulated-Inertia.xlsx
DS3 Programme
EirGrid
Grid Code

Signal List for DSU (Northern Ireland)

  • Read more about Signal List for DSU (Northern Ireland)

The DSU Signal List which includes the signals required for the provision of System Services

NI-DSU-Signal-List-System-Services-FFR.xlsx
Grid Code
DS3 Programme
EirGrid

Reserve Curve Tool

  • Read more about Reserve Curve Tool

The Reserve Curve Tool to assist calculation of reserve curves for DS3 System Services

Reserve-Curve-Tool.xlsb
DS3 Programme
Grid Code
EirGrid

Battery Ramping Test Report Template

  • Read more about Battery Ramping Test Report Template

Test Report template for units wishing to apply for a DS3 System Services Ramping contract

Battery-Ramping-test-report-template.docx
System Services
EirGrid
DS3 Programme

Aggregator Ramping Margin Test Procedure Template

  • Read more about Aggregator Ramping Margin Test Procedure Template

Procedure to gather data required for a DSU or AGU to contract for provision of a dispatch-based System Services contract

Aggregator-Ramping-Margin-test-procedure-template.docx
EirGrid
Grid Code
DS3 Programme

EirGrid TSO Stakeholder Engagement Report 2018

  • Read more about EirGrid TSO Stakeholder Engagement Report 2018

Report of 2018 performance in Stakeholder Engagement

202517-EirGrid-Stakeholder-Engagement-Report_LR10.pdf
EirGrid

EirGrid TSO Stakeholder Engagement Report 2018 – Consultation Note

  • Read more about EirGrid TSO Stakeholder Engagement Report 2018 – Consultation Note

Consultation Note to accompany Stakeholder Engagement Report 2018

EirGrid-TSO-Stakeholder-Engagement-Report-2018-Consultation-Note.pdf
EirGrid

DS3 System Services Protocol - Regulated Arrangements

  • Read more about DS3 System Services Protocol - Regulated Arrangements

DS3 System Services Implementation Project

DS3-System-Services-Protocol-Regulated-Arrangements-v2.0.pdf
System Services
EirGrid
DS3 Programme

Pagination

  • Previous page
  • Current page 62
  • Next page
Subscribe to EirGrid