The aim of this Phase Two Lead Consultant�s Site and Corridor Evaluation Report (Phase Two Report) is
to evaluate the emerging preferred options identified in the Phase One Lead Consultant�s Site and Corridor
Identification Report (Phase One Report), and any justifiable modifications to the options, following
consideration of all consultation feedback received to date and the iterative engineering design process, in
order to identify the preferred site and connection options.