Emerging Preferred Substation Site and Route Corridors Map Figure 7.2
A3 Emerging Preferred Substation Site and Route Corridors Map Figure 7.2 AT SCALE 1:25,000
Emerging Preferred Substation Site and Route Corridor Options Map Figure 7.1
A3 Emerging Preferred Substation Site and Route Corridor Options Map Figure 7.1 AT SCALE 1:25,000
Route Corridor Environmental Constraints Map Figure 5.1
A3 Route Corridor Environmental Constraints Figure 5.1 AT SCALE 1:25,000
Substation Site Environmental Constraints Map Figure 4.1
A3 Substation Site Environmental Constraints Figure 4.1 AT SCALE 1:25,000
Route Corridor Selection Map Figure 3.2
A3 Route Corridor Selection Map Figure 3.2 AT SCALE 1:30,000
Substation Site Selection Map Figure 3.1
A3 Substation Site Selection Map Figure 3.1 AT SCALE 1:30,000
Millstreet Constraints Map Figure 2.2
A3 Millstreet Constraints Map Figure 2.2 AT SCALE 1:30,000
Preliminary Constraints Map Figure 2.1
A3 Preliminary Constraints Map Figure 2.1 AT SCALE 1:35,000
MillStreet Project Figure 1.1 Map
A3 MillStreet Project Figure 1.1 Map AT SCALE 1:35,000
Millstreet Project Phase Two - Site and Route Corridor Evaluation Report March 2011
The aim of this Phase Two Lead Consultant�s Site and Corridor Evaluation Report (Phase Two Report) is
to evaluate the emerging preferred options identified in the Phase One Lead Consultant�s Site and Corridor
Identification Report (Phase One Report), and any justifiable modifications to the options, following
consideration of all consultation feedback received to date and the iterative engineering design process, in
order to identify the preferred site and connection options.