EirGrid Ex-Post Outturn Availability Connection Asset Maintenance Report 2021 - Part 2
Review of OACA maintenance work carried out in 2021
Annual Electricity Transmission Performance Report 2020
This report seeks to provide customers, industry and stakeholders with clear and accessible
reporting on our operation, development and maintenance of the transmission system.
Transmission Outage Programme 2022
Communication of transmission outages in 2022
ECP 2.1 Constraints Report – Line Ratings
ECP 2.1 Solar and Wind Constraints Report – Line Ratings
ECP 2.1 Solar and Wind Constraints Report – Area Wind and Solar Profiles
ECP 2.1 Solar and Wind Constraints Report – Area Wind and
Solar Profiles
ECP 2.1 Solar and Wind Constraints Report - Node Results
ECP 2.1 Solar and Wind Constraints Report - Node Results in
Excel format.
Technical Assessment of 2030 Study Outcomes
Potential Solutions for Mitigating Technical Challenges
Arising from High RES-E Penetration on the Island of Ireland.
ECP 2.1 Solar and Wind Constraints Report – Area K – v1.0
ECP constraints report for Area K
ECP 2.1 Solar and Wind Constraints Report – Area J – v1.0
ECP constraints report for Area J