Skip to main content

Breadcrumb

  1. Back to site
  2. Operations
  3. View Publication Categories

Operations

Transmission Outage Summary 2020 (Week 39-40)

  • Read more about Transmission Outage Summary 2020 (Week 39-40)

Two week summary of transmission outages

Summary-TOP-Weeks-39-40-(2020-09-09).pdf
EirGrid
Operations
Transmission

Operational Constraints Update – August 2020

  • Read more about Operational Constraints Update – August 2020

Monthly update of all island system constraints

OperationalConstraintsUpdateVersion1_97_August_2020.pdf
Operations
Constraints Update

Proposed Testing Tariffs 2021

  • Read more about Proposed Testing Tariffs 2021

Proposed Testing Tariff Rates for 2021

Proposed-Testing-Tariff-Rates-2021.pdf
EirGrid Group
Operations

Transmission Outage Summary 2020 (Week 37-38)

  • Read more about Transmission Outage Summary 2020 (Week 37-38)

Two week summary of transmission outages

Summary-TOP-Weeks-37-38-(2020.08.26).pdf
Transmission
Operations

Transmission Outage Summary 2020 (Week 35-36)

  • Read more about Transmission Outage Summary 2020 (Week 35-36)

Two week summary of transmission outages

Summary-TOP-Weeks-35-36-(2020.08.12).pdf
Transmission
Operations

ECP-1 Solar and Wind Constraints – Ireland Summary

  • Read more about ECP-1 Solar and Wind Constraints – Ireland Summary

EirGrid publish these reports to inform and to provide assistance
to generator developers

ECP-1-Solar-and-Wind-Constraints-Ireland-Summary.pdf
EirGrid
Operations

Transmission Outage Programme 2020

  • Read more about Transmission Outage Programme 2020

Transmission Outage Programme 2020

2020-Transmission-Outage-Programme-(20200804).xlsx
Transmission
Operations

Operational Constraints Update

  • Read more about Operational Constraints Update

Monthly update of all island system constraints

OperationalConstraintsUpdateVersion1_96_July_2020.pdf
Operations
EirGrid

Transmission Outage Summary 2020 (Week 33-34)

  • Read more about Transmission Outage Summary 2020 (Week 33-34)

Two week summary of transmission outages

Summary-TOP-Weeks-33-34-(2020-07-29).pdf
EirGrid
Transmission
Operations

Controllability Status Update

  • Read more about Controllability Status Update

Three level hierarchy classification for Wind farms

2020-05-May-Controllability-status-update.pdf
EirGrid Group
Operations

Pagination

  • Previous page
  • Current page 28
  • Next page
Subscribe to Operations