EirGrid Generic Flexible Demand Operating Protocol
This protocol sets out the operational arrangements in place between the System Operator and the Customer for implementation of Flexible Demand Arrangement at the Customer’s site(s).
Firm Access 2025 Review Report
List of Generators (Draft) for Firm Access Review 2025
Reduced Criteria for Generation Facilities Connection Application Form to the Transmission System (Word)
This application, (Reduced Criteria - Generation Application Form) outlines the reduced criteria EirGrid requires to progress an application for connection to the Transmission System.
Reduced Criteria for Generation Facilities Connection Application Form to the Transmission System (PDF)
This application, (Reduced Criteria - Generation Application Form) outlines the reduced criteria EirGrid requires to progress an application for connection to the Transmission System.
Harmonised Other System Charges Methodology Statement Applicable from 1st October 2024
Other System Charges (OSC) are levied for non-compliance to provide necessary services to the system. This document sets out the harmonised arrangements for the calculation of Other System Charges by the Transmission System Operators (TSOs), EirGrid in Ireland and SONI in Northern Ireland respectively, in accordance with the Regulatory Authorities' (RAs) Decision Paper SEM-24-057.
2024 September - SOEF Markets - FASS - SS Charge Consultation Workshop Q&A
EirGrid and SONI held a virtual industry workshop on Thursday 5th September 2024, where the TSOs and our partners Afry presented the All-Island System Services Supplier Charge Consultation Paper and hosted a Q&A session. This document contains the questions asked in the session and the TSOs' responses.