Contracted TSO (Non Wind) Generators as of 29 May 2020
Updated report, re connected projects
TSO_NonWind_Contracted_29.05.2020.pdf
Final list of applications that meet the criteria for the 2018 ECP-1 batch
Report listing eligible 2018 batch applications
2018-Batch-(ECP-1)-Eligible-Applications-Joint-SO-Publication-31.8.18.pdf
Contracted TSO Wind Farms as of 15 June 2018
Updated report in relation to connected wind projects
Contracted-TSO-Wind-Farms.pdf
Contracted TSO (Non Wind) Generators
Updated report in relation to non-wind connected projects
Contracted-TSO-(Non-Wind)-Generators.pdf
17/18 DTUoS Information Note
17/18 Demand Transmission Use of System (DTUoS) Tariffs Information Note
1718DTUoSInformationNotev1.0.pdf
Solar Panel Clearance Policy
Solar Panel Clearance Policy
Solar-Farm-Clearances-to-Transmission-OHL_Interim-Approach_June17.pdf
Wind Turbine Clearance Policy
Wind Turbine Clearance Policy
Wind-Turbine-Clearance-Policy.pdf
OSC Recommendations Paper 2017-18
Other System Charges Recommendations Paper 2017-18
OSC-Recommendations-Paper-2017-18.pdf
Proposed 2017/2018 Generator Transmission Use of System (GTUoS) Tariffs
Proposed 2017/2018 Generator Transmission Use of System (GTUoS) Tariffs
Proposed-1718-Generator-Transmission-Use-of-System-(GTUoS)-Tariffs.pdf
East West Interconnector - Long Term Auction Timetable 2017
East West Interconnector - Long Term Auction Timetable 2017
EWIC-AuctionCalendar2017-v2-updated-31012017.pdf