I-SEM Public Consultation - Modification Proposal
I-SEM Public Consultation - Modification Proposal
Public-Consultation-EirGrid-Grid-Code-Mods-Detail_V0-2-(1).pdf
Cover Letter - Proposed Grid Code Modification required for I-SEM
Cover Letter - Proposed Grid Code Modification required for I-SEM
EIRGRID_Grid-Code-Modification-Proposal-Cover-Letter-v2.pdf
TSO & DSO Wind Farm Protocol Document
Procedures need for all wind farms for Frequency response testing
DSO-TSO-WFPS-process-Rev.1.0-.pdf
Load Profile Request Form
Procedures need for all wind farms for Frequency response testing
WFPSLoadProfileRequestForm.xlsx
List of Members of the Ireland GCRP
List of Members of the Ireland GCRP
2016_MembershipOfTheIrelandGridCodeReviewPanel_Updated-21-September-2016.docx
Test 46 & 48 Operating Reserves, Governor Droop and RCOF
Test 46 & 48 Operating Reserve
Test_46_48_Operating-Reserves-Final.docx
Grid Code Modifications Table - Modifications to Version 5 and Older
Archived Modifications – up to and including Grid Code Version 5
Grid-Code-Modifications-Table-Modifications-to-Version-5-and-Older-Updated-15-September-2016.pdf
DSU MW Capacity Individual Site Test
DSU MW Capacity Individual Site Test
Signals-and-communications-check-to-NCC-for-Individual-site-of-XXX-DSU-Updated-April-2016-(1).docx
DSU MW Capacity Aggregate Test
DSU MW Capacity Aggregate Test
DSU-Test-Procedure-Aggregate-MW-Capacity-Updated-April-2016-(1).docx
WFPS Reactive Power Capability Test Procedure
WFPS Reactive Power Capability Test Procedure
WFPS-Reactive-Power-Capability-Test-Procedure.docx