Strategic Social Impact Assessment Scoping Report Kildare-Meath Grid Upgrade Step 3

This Social Impact Assessment Scoping Report has been
prepared to identify the social impacts that could occur
as a result of the Kildare-Meath Grid Upgrade / CP966
project and to assess the three technologies under
consideration.

Draft-Strategic-SIA-Scoping-Report-Kildare-Meath-Grid-Upgrade-Step-3.pdf

Cable integration studies for Kildare-Meath Grid Upgrade Step 3

The studies associated with cable integration cover:
1- Steady state load flow studies for the determination of reactive
compensation
2- Frequency domain studies to establish harmonic voltage magnification and
potential breaches, and
3- Time domain studies to check possible temporary overvoltages (TOV) and
zero-cross missing phenomenon during cable energisation.

Cable-integration-studies-for-Kildare-Meath-Grid-Upgrade-Step-3.pdf

CP1116 Proposed Tipperary, Cahir and Connected Stations Protection Upgrade and Connected Stations Projection Upgrades

The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.

2020061620CP1116_AA20Screening_Determination_PE20issue[1].pdf