Grid Development

Celtic Interconnector – Step 4 Project Update Document – Spring 2020

  • Read more about Celtic Interconnector – Step 4 Project Update Document – Spring 2020

Celtic Interconnector – Step 4 Project Update Document – Spring
2020

Celtic-Interconnector-Step-4-Project-Update-Document-Spring-2020.pdf
EirGrid
Celtic Interconnector
Grid Development

110kV Underground Cable Drawings

  • Read more about 110kV Underground Cable Drawings

110kV Underground Cable Drawings

XDC-CBL-STND-H-001-013-110-kV-Underground-Cable-Drawings-combined-copy.pdf
EirGrid
Grid Development

Transmission Development Plan Northern Ireland 2019-2028

  • Read more about Transmission Development Plan Northern Ireland 2019-2028

Transmission Development Plan Northern Ireland 2019-2028

Transmission-Development-Plan-Northern-Ireland-Draft-2019-2028.pdf
Transmission
EirGrid Group
Grid Development
Development Plan
TSO Regulatory Publications
2019

Distributed Series Reactors (Flagford to Sliabh Bawn 110 kV Line)

  • Read more about Distributed Series Reactors (Flagford to Sliabh Bawn 110 kV Line)

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.

2020-01-31-DSR-1-page-Screening-determination_-EA-issue_.pdf
Grid Development

Dunstown-Moneypoint 400 kV Refurbishment (Phase 1)

  • Read more about Dunstown-Moneypoint 400 kV Refurbishment (Phase 1)

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.

2020-01-31-Dunstown-to-Moneypoint-Phase-1-AASS-Determ_EA-issue.pdf
Grid Development

Transformers Protection Upgrades (Six 110 kV substations - EirGrid AA Screening Determination

  • Read more about Transformers Protection Upgrades (Six 110 kV substations - EirGrid AA Screening Determination

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.

2020-01-24-Transformers-Protection-Upgrade-1-page-Screening-determination_-EA-issue.pdf
Grid Development

Louth-Rathrussan 110 kv Refurbishment

  • Read more about Louth-Rathrussan 110 kv Refurbishment

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.

2020-01-24-Louth-Rathrussan-110-kv-Refurbishment-1-page-Screening-determination_-EA-issue.pdf
Grid Development

Flagford - Louth 220 kV Line Refurbishment- EirGrid AA Screening Determination”

  • Read more about Flagford - Louth 220 kV Line Refurbishment- EirGrid AA Screening Determination”

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.

20192011200620Flagford20Louth20AA20120page20Screening20determination_20POW20text20without20case20ref_EA20issue[1].pdf
Grid Development

Maynooth - Woodland 220 kV Line Refurbishment- EirGrid AA Screening Determination

  • Read more about Maynooth - Woodland 220 kV Line Refurbishment- EirGrid AA Screening Determination

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.

20192012200320Maynooth20-20Woodland2022020kV20Line20Refurbishment20AA20120page20Screening20determ[1].pdf
Grid Development

EirGrid Electricity Transmission Performance Report 2018

  • Read more about EirGrid Electricity Transmission Performance Report 2018

EirGrid Electricity Transmission Performance Report 2018

205388-EirGrid-Electricity-Transmission-Performance-Report_LR2.pdf
Transmission
Operations
Grid Development
TSO Regulatory Publications
2018

Pagination

  • Previous page
  • Current page 37
  • Next page
Subscribe to Grid Development