EirGrid Evidence Based Environmental Studies - EMF
Literature review of electromagnetic fields (EMF) and human health, and an evidence base of EMF measurements from the Irish Transmission System.
EirGrid commences new round of public consultation on Grid West project
Five open days from 7th � 11th July across counties Mayo, Roscommon & Leitrim.
Feedback from the public to form part of analysis of both underground and overhead
route options to be reviewed by Independent Expert Panel before the project
progresses
THE GRID WEST PROJECT ENGINEERING CONSTRAINTS MAP
A0 ENGINEERING CONSTRAINTS MAP AT SCALE: 1:175,000
Grid25 strategy not related to proposals by private developers to export renewable energy to UK
EirGrid�s Grid25 strategy is not related in any way to current draft proposals by private developers to export renewable energy to Great Britain.
EirGrid Grid25 Initiatives 28th January 2014
This document cover 4 main topics 1. Conduct a comprehensive underground analysis for the Grid Link and Grid West projects.2. Implement a Community Gain Fund encompassing a fund for localities and one for residences located close to new pylons and stations. 3. Continue to monitor research developments and provide information on health and power lines. 4. Comprehensively address major issues arising such as tourism, agriculture and equine concerns.
EirGrid Health and the East West Interconnector 15 January 2014
Document details the inaccurate commentary which suggested the EirGrid East West Interconnector was put underground as a result of health concerns.
Grid West project announces preferred corridor for high capacity power line
EirGrid announced the emerging preferred route corridor for the Grid West project. The chosen 1km wide corridor, which will accommodate a new power line, starts north west of Moygownagh, runs west of Ballina, east of Foxford and Swinford, south of Charlestown and Ballaghaderreen before linking into the existing Flagford substation, near Carrick-on-Shannon.
EirGrid Report Identifies Route Corridor Options for the Grid Link Project New Power Line to Facilitate Job Creation and Investment in the South and East Tuesday 3rd September 2013:
EirGrid published a significant report on the Grid Link Project identifying a number of feasible 1km wide route corridor options for a new 400kV overhead power line linking Leinster and Munster.
The Grid Link Project Lead Consultant�s Stage 1 Report Prepared for EirGrid by RPS Group
The purpose of this Lead Consultant�s Stage 1 Report is to draw together the work completed as part of Stage 1 of EirGrid�s
Project Development Road Map for the Grid Link Project.
THE GRID WEST PROJECT Project Information Brochure Stage 2: Evaluate Options Autumn 2013
THE GRID WEST PROJECT Project Information Brochure Stage 2: Evaluate Options Information Brochure 4