Laois-Kilkenny Reinforcement Project Planning Application- Project Roadmap 10th February 2011 Update

Laois-Kilkenny Reinforcement Project Planning Application- Project Roadmap including PHASE 1 - INFORMATION GATHERING, PHASE 2 - ROUTE CORRIDOR & SITE EVALUATION, PHASE 3 - LINE ROUTE AND PHASE 4 - APPLICATION SUBMISSION

Laois Kilkenny Public_RoadMap_10February2011_REV1.pdf

LAOIS � KILKENNY REINFORCEMENT PROJECT: 400/110KV SUBSTATION INCLUDING ASSOCIATED LINE AND STATION WORKS WINTER BIRD SURVEYS INTERIM REPORT

Dr Patrick Crushell was commissioned by AOS Planning to assess the abundance and distribution of wintering wader and wildfowl birds in the study area of two proposed substations (at Ballyragget Co Kilkenny and South East of Portlaoise, Co Laois) and an interconnecting 110 kV powerline.

Appendix D-9 Winter Bird Survey Feb 2011.pdf

Laois - Kilkenny Reinforcement Project Technical Comparison of AIS v GIS Substation Options

The purpose of the following report is to provide a cost and technical comparison between Air
Insulated Switchgear (AIS) and Gas Insulated Switchgear (GIS) substations for the purposes
of building a 400kV Substation for the Laois-Kilkenny Reinforcement Project.

Appendix B Technical Comparison of AIS vs.GIS Substation Opt.pdf

Laois � Kilkenny Reinforcement Project Ecology, Cultural Heritage, Soils & Geology and Hydrology & Hydrogeology Reports

AOS Planning Limited has been commissioned by ESBI to prepare an
environmental report for an underground electricity cable route (Route A) for
a new 110kV underground electricity circuit as part of the Laois � Kilkenny
Reinforcement Project. The environmental report covers the topics of Ecology,
Cultural Heritage, Soils & Geology and Hydrology & Hydrogeology.

Appendix A-3 Environmental Reports in Relation to an Undergr.pdf

LAOIS � KILKENNY REINFORCEMENT PROJECT: 400/110KV SUBSTATION INCLUDING ASSOCIATED LINE AND STATION WORKS RESULTS OF WINTER BIRD SURVEYS INTERIM REPORT

Dr Patrick Crushell was commissioned by AOS Planning to assess the abundance and distribution of
wintering wader and wildfowl birds in the study area of two proposed substations (at Ballyragget Co
Kilkenny and South East of Portlaoise, Co Laois) and an interconnecting 110 kV powerline (23km straight
line).

Appendix D-8 Winter Bird Survey Dec 2010.pdf