Power System Studies Laois � Ballyragget Cable Feasibility Study PE667-F0400-R300-001-003

The purpose of this study was to asses the technical implications of installing a
110kV overhead line or cable between Ballyragget 110kV substation and Laois
400kV substation. In order to asses the feasibility of the overhead line/cable circuit,
power flow, short circuit, transient and harmonic studies were carried out.

Appendix A-4 Power System Studies Laois-Ballyragget Cable Fe.pdf

Millstreet Project Phase Two - Site and Route Corridor Evaluation Report March 2011

The aim of this Phase Two Lead Consultant�s Site and Corridor Evaluation Report (Phase Two Report) is
to evaluate the emerging preferred options identified in the Phase One Lead Consultant�s Site and Corridor
Identification Report (Phase One Report), and any justifiable modifications to the options, following
consideration of all consultation feedback received to date and the iterative engineering design process, in
order to identify the preferred site and connection options.

Phase 2 Report.pdf