CLASHAVOON-DUNMANWAY Project Phase 2 Lead Consultants Report Route Corridor Evaluation and Indicative Line Route Selection Report

This Phase 2 Lead Consultants Report prepared by ESB International, should be read in conjunction with
the previously published Phase 1 Lead Consultants Corridor Identification Report available on the EirGrid projects webpage

Phase Two Lead Consultants Report.pdf

Clashavoon Dunmanway 110kV Project Phase 1 - Lead Consultants Corridor Identification Report

The Aim of this Phase One Lead Consultants Report is to present what is currently considered by ESBI (EirGrids Lead Consultant) to be the emerging preferred corridor within which to site the proposed new circuit

Phase 1 Lead Consultants Corridor Identification Report.pdf