EirGrid Market Operator Annual Compliance and Assurance Officer Report 2023
Condition 9(3) of EirGrid’s Market Operator Licence (the Licence) requires the licensee to report to the commission annually specifying the measures taken and the level of compliance to ensure that discriminatory conduct by it or its employees is prevented.
Winter Outlook 2024/25
The Loss of Load Expectation (LOLE) in Ireland for the five months of the winter period being studied is 3.6 hours. The LOLE has reduced from 21 hours last winter and 51 hours the previous winter; however, it remains just outside the three hours per year standard.
PR5 DSO/TSO Joint Incentive Multi- Year Plan 2025-2029 Call for Input Consultation Paper June 2024
The CRU “PR5 Regulatory Framework, Incentives and Reporting” Decision Paper (CRU/20/154), published in December 2020, introduced a regulatory incentive on joint TSO/DSO co-ordination. This incentive should ensure that EirGrid as the Transmission System Operator (TSO) and ESB Networks as the Distribution System Operator (DSO) can help each other in achieving their targets or delivering their plans. The incentive encourages and rewards TSO/DSO co-ordination and collaboration.
EirGrid Group Tuarascáil Bhliantúil 2023
Éileoidh an fás ar leictreachas glan ó fhoinsí in-athnuaite an córas leictreachais a athrú ó bhonn, agus tá ról lárnach ag EirGrid sa chomhthéacs seo. Sa tuarascáil bhliantúil seo clúdaítear an tréimhse idir an 1 Deireadh Fómhair 2022 agus an 30 Meán Fómhair 2023.
EirGrid Group Annual Report 2023
The growth in clean electricity from renewable sources will require transformative change to the electricity system, and EirGrid has a central role to play in this. This annual report covers the period from 1 October 2022 through to 30 September 2023.
Ráiteas um Thoilleadh Giniúna Deich mBliana 2023–2032 - Achoimre
Is achoimre é seo ar an Ráiteas um Thoilleadh Giniúna (RTG), a fhoilsíonn EirGrid gach bliain. Scrúdaíonn sé an chothromaíocht dhóchúil idir éileamh agus soláthar leictreachais le linn na mblianta 2023 go 2032.
Generation Capacity Statement 2023–2032
The Generation Capacity Statement (GCS), which is published annually by EirGrid, examines the likely balance between electricity demand and supply during the years 2023 to 2032. You can find the accompanying GCS Data Workbook here: https://cms.eirgrid.ie/sites/default/files/publications/GCS-2023-2032-D…
Generation Capacity Statement 2023–2032 Data Workbook
This data workbook accompanies the Ten-Year Generation Capacity Statement 2023–2032, which can be found here: https://cms.eirgrid.ie/sites/default/files/publications/19035-EirGrid-G…