Gate 1 & Gate 2 Associated Transmission Reinforcements
Gate 1 & Gate 2 Associated Transmission Reinforcements
Gate 1 and Gate 2 Associated Transmission Reinforcements 06092012.docx
Approval of the Access Rules and Charging Methodology Statement - East-West Interconnector
Read CER approval of the the access rules and charging methodology for the East-West Interconnector
SEM-12-079_CER_Approval_Letter_of_EIL_Acces_Rules_and_Charging_methodology_Statement.pdf
Irish ENTSO-E public consultation workshop, Demand side Response, Mark Norton, 2012
Demand side response
No3 DCC Demand Side Response.pdf
Irish ENTSO-E public consultation workshop on Demand Connection Code (DCC) Dundalk, Mark Norton, 2012
ENTSO-E presentation on network codes.
No2 DCC Developent Challenges and Scope.pdf
Summary of Studies on Rate of Change of Frequency events on the All-Island System
Summary of Studies on Rate of Change of Frequency events on
the All-Island System
Summary-of-Studies-on-Rate-of-Change-of-Frequency-events-on-the-All-Island-System.pdf
Network Codes development, Edwin Haesen, August 2012
Network codes development
No1 DCC_Development.pdf
Offer Process Application Information -
Disclosure of applicants
Offer Process Application Information -
Disclosure of applicants
Connection Offer Disclosure of Applications 23rd July 2012.pdf
TSO/DSO Non Wind Generators Connected
TSO Wind Generators Connected
Node/Name/Type/MEC/Year
Connected TSO Wind Farms 23rd July 2012.pdf
TSO Non Wind Generators Connected
TSO Non Wind Generators Connected
Node/Name/Type/MEC/Year
Connected TSO (Non-Wind) Generators 23rd July 2012.pdf
MPID 221 Intra Day Trading Approval Letter
MPID 221 – Intra Day Trading CER Approval Letter
MPID-221-Intra-Day-Trading-CER-approval.pdf